Product code: Shops Microprocessor-Controlled-Automatic-120V
Installing silver rods. Install silver rods by putting the box onto a flat surface (lid is up). Push the silver rods using some force into the two connectors shown below. Confirm the silver rods are attached. For 10 PPM silver keep the silver rods spaced at one 1/2 Inch at the bottom For 10 ppm. This shops will complete in about 3 hours. Includes silver rods and 120V ac power.
Installing silver rods. Install silver rods by putting the box onto a flat surface (lid is up). Push the silver rods using some force into the two connectors shown below. Confirm the silver rods are attached. For 10 PPM silver keep the silver rods spaced at one 1/2 Inch at the bottom For 10 ppm. This shops will complete in about 3 hours. Includes silver rods and 120V ac power.